LOADS FROM ETABS TO PCA COLUMN

broken image
broken image

Any input concerning assignment of hinges to beams, columns and shear walls is highly appreciated. I would like to know what would be a better estimate for relative distances for plastic hinges in case of beams, columns. While assigning plastic hinges, I have an option of using ASCE 41-17 (Seismic Evaluation and Retrofit of Existing buildings'. I will be using ETABS 2017 for performing Pushover Analysis. Until now, I have decided to go with 'Displacement Co-efficient method'.

broken image

I'll be performing 'Non-Linear Static Pushover Analysis' for my model. I am interested in performing 'Performance Based Design' for a 20 story building.

broken image